• Operation management • Previous Articles Next Articles
LIANG Zhihai, YUAN Lian-qing, ZHANG Qing-fu and et al.
Online:
Published:
梁志海,袁连庆,张庆福,魏樱
Abstract: Taipingwan hydropower station is of daily regulation, low head and large flow, thus tailrace sedimentation may cause power loss. This paper discussed this issue, for reference.
摘要: 太平湾电站为日调节、低水头、大流量水电站,尾水渠淤积后,因水头减小而造成电能损失,本文对此问题进行简要分析,供探讨。
梁志海,袁连庆,张庆福,魏樱. 太平湾电站泄洪后尾水渠淤积与电能损失的分析[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2009/V0/I4/23