Study on deformation characteristics and comprehensive treatment scheme of giant creepy accumulation slope of Baihetan hydropower station

LAI Daoping, XU Jianrong, PENG Yu, PENG Qingtao
  

  1. PowerChina Huadong Engineering Corporation limited
  • Received:2025-08-08 Online:2026-02-28 Published:2026-03-10

白鹤滩水电站巨型蠕滑堆积体变形特征及综合处理方案研究

赖道平,徐建荣,彭  育,彭清涛   

  1. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122
  • 作者简介:赖道平(1977— ),男,江西宁都人,博士,正高级工程师,主要从事高边坡、高坝等方面的研究与设计工作。

Abstract:

The Xiahongyan accumulation slope is located at the right valley shoulder of the dam site of Baihetan hydropower station, which is giant and creepy. It exerts great impact on the safety of the project. North-south longitudinal length of the accumulation slope is about 1 800 m, and east-west transverse width is 115~740 m. Its volume is about 18 million m3, with a plane area of about 0.82 km2
and an average thickness of about 22 m. The deformation monitoring and surface fracture investigation show that Xiahongyan accumulation slope is in a state of creep and its deformation direction and degree are zoned. Combined with the zoned characteristics of deformation, different sections are selected to analyze the slope stability. Then, a comprehensive treatment scheme of "berming with spoil, anti-slip pile and local slope anchorage" is proposed. The monitoring results show that the treatment measures have achieved the expected results, providing reference for design and research of similar projects.

Key words:

摘要:

下红岩堆积体位于白鹤滩水电站坝址右岸谷肩部位,为巨型蠕滑堆积体,对工程安全影响大。堆积体南北纵向长约1 800 m,东西横向宽115~740 m,平面面积约0.82 km2,平均厚度约22 m,体积约1 800万m3。通过变形监测、地表裂缝调查研究发现,天然的下红岩堆积体处于蠕滑状态,其变形方向和变形程度具有分区特征。根据分区变形特征选取剖面计算分析边坡稳定性,提出“堆渣压坡、抗滑桩和局部坡面锚固”的综合处理方案。监测结果表明处理措施取得了预期的效果,可为类似工程设计研究提供借鉴。

关键词:

CLC Number: