Dam & Safety ›› 2023, Vol. 0 ›› Issue (3): 27-30.

Previous Articles     Next Articles

Comprehensive monitoring technologies for the 620 m high slope on the right bank of Hongshiyan barrier lake in Ludian County of Yunnan

LI Zhijing, GENG Yijun, ZHANG Qingliang and ZHU yang   

  1. China Renewable Energy Engineering Institute
  • Online:2023-06-20 Published:2023-06-30

云南鲁甸红石岩堰塞湖右岸 620 m 高边坡综合监测技术

李志敬1,2,耿轶君2,张庆良3,朱 阳4   

  1. 1. 水电水利规划设计总院,北京,100120;2.黄河勘测规划设计研究院有限公司,河南 郑州, 450003;3. 云南水投牛栏江堰塞湖工程建设有限公司,云南 昆明,657100;4. 武汉天测测绘科技有限公司,湖北 武汉,430074
  • 作者简介:李志敬(1978— ),男,博士,高级工程师,主要从事水利水电工程安全监测、安全评估及防护治理等工作。
  • 基金资助:
    国家重点研发计划(2019YFC1509703)

Abstract: The total storage capacity of the barrier lake formed by the 8·3 Ludian earthquake in Yunnan is 2.6×108 m3. As a large barrier lake, its risk level is extremely high. The loss caused by landslide dam burst is serious, with a risk level of I. This paper introduces the geological conditions of the 620 m high slope on the right bank of Hongshiyan barrier lake, analyzes various factors affecting the stability of the high slope, and proposes a comprehensive monitoring system suitable for the high slope.

Key words: barrier lake, earthquake, high slope, comprehensive monitoring technology

摘要: 云南 8·3 鲁甸地震形成的堰塞湖总库容2.6×108 m3,属大型堰塞湖,危险级别为极高,堰塞体溃决损失严重,风险等级为I 级。笔者介绍了鲁甸地震形成的红石岩堰塞湖右岸620 m 高边坡的工程地质情况,分析了影响高边坡稳定的诸多因素,并针对各因素提出了适用于高边坡的综合监测技术。

关键词: 堰塞湖, 地震, 高边坡, 综合监测技术

CLC Number: