Reflection and countermeasures of“7·19”flood event of Shuibuya dam

GONG Jian-bing and PI Jun-hua   

  1. Hubei Qingjiang Hydropower Development Co., Ltd.
  • Received:2017-12-13 Online:2018-04-08 Published:2018-04-08

水布垭水电站大坝2016 年“7·19”水毁事件反思与对策

贡建兵,皮军华   

  1. 湖北清江水电开发有限责任公司,湖北 宜昌,443000
  • 作者简介:贡建兵(1971- ),男,江苏丹阳人,正高职高级工程师,主要从事水电站大坝运行安全管理。

Abstract: On July 19 of 2016, Shuibuya hydropower station suffered a heavy rainfall with recurrence period of 100 years and a flood with recurrence period of 50 years, which caused a number of dangers and disasters, and seriously threatened the safe operation of dam and power generation equipment. Although there was no personal injury, the direct economic loss amounted to about 50 million yuan. From the natural factors, geological condition, flood discharge and other aspects, this paper analyzes the causes of “7·19”flood event, and reveals the problems existed in the design, construction and operation management. Finally, this paper summarizes the experience of reservoir operation, emergency response, integration of construction and management as well as operation management, and puts forward some countermeasures for dam safety management in future.

Key words: Shuibuya hydropower station, flood damage, flood discharge, debris flow, slope collapse, traffic disruption, submerging powerhouse, emergency response

摘要: 2016年7月19日,水布垭水电站大坝遭遇重现期100年的强降雨及重现期50年的洪水工况,引发多处险情和灾情,严重威胁大坝和发电设备的安全运行,虽未发生人身伤亡事件,但直接经济损失达5 000多万元。通过真实数据和图片,从自然因素、地质条件、泄洪雾化、工程实际等方面剖析“7·19”水毁成因,揭示设计、施工、运行管理中存在的问题,从水库调度、应急响应、建管结合、运行管理等方面进行经验总结,为今后大坝安全管理提出有益对策。

关键词: 水布垭水电站, 水毁, 泄洪, 泥石流, 边坡垮塌, 交通中断, 水淹厂房, 应急响应