Dam & Safety ›› 2018, Vol. 0 ›› Issue (2): 27-.

Previous Articles     Next Articles

Discussion on conditions for unattended HuaguangtanⅠhydropower station

CHENG Yan-zhong   

  1. Zhejiang Energy Huaguangtan Hydropower Co., Ltd.
  • Received:2018-02-26 Revised:2018-03-19 Online:2018-04-08 Published:2018-04-08

华光潭一级水电站无人值班若干条件的探讨

程言忠   

  1. 浙江浙能华光潭水力发电有限公司,浙江 杭州,311322
  • 作者简介:程言忠(1983- ),男,江苏徐州人,工程师,从事发电厂生产管理工作。

Abstract: Taking HuaguangtanⅠhydropower station as an example, several conditions for unattended HuaguangtanⅠhydropower station are discussed, including improving the equipment safety and reliability, strengthening safety measures for fire prevention and prevention of submerging powerhouse, improving the comprehensive automation level and some necessary external conditions, for reference.

Key words: hydropower station, unattended, condition

摘要: 以华光潭一级水电站为例,从提高设备的安全可靠性、加强防火和防止水淹厂房的安全措施、提高电站综合自动化水平以及必要的外部条件等方面,对水电站实现无人值班的若干条件进行了探讨,以期为类似水电站的运行方式提供借鉴和参考。

关键词: 水电站, 无人值班, 条件