Abstract: As high elevation, short effective construction period and more rainfall in summer, the asphalt concrete core wall is selected as anti-seepage body of Kangsugou dam, which has the advantages of rapid construction, good anti-seepage effect and being little affected by weather conditions.
Key words: reservoir, asphalt concrete core dam, mix proportion
摘要: 康苏沟水库海拔较高、有效施工期较短、夏季降雨较多,采用沥青混凝土心墙作为大坝的防渗体,具有施工较快、防渗效果较好、天气对施工影响较小等优势,在当地水库建设中得到广泛应用。
关键词: 水库, 沥青混凝土心墙坝, 配合比