ISSN 1671-1092 CN 33-1260/TK

• 贵州引子渡水电站工程建设专辑 • 上一篇    下一篇

引子渡水电站溢洪道设计与试验研究

姚元成,杨金涛   

  1. 国家电力公司贵阳勘测设计研究院,贵阳 550002
  • 出版日期:2004-04-28 发布日期:2004-04-28

On spillway designing and experiment study of Yinzidu hydropower station

YAO Yuan-cheng and YANG Jin-tao   

  • Online:2004-04-28 Published:2004-04-28

摘要: 综合考虑枢纽布置,通过理论设计与试验研究结合,调整滥洪道布置.使其满足施工及运行要求。

Abstract: To comprehensive consider the layout of the whole hydraulic structure, design of spillway layout is adjusted to meet the requirement of construction and operation through theory design and experimental study.?