1991 Vol.0, No. 1   Published: 28 March 1991
           
Summary of monitoring

Present Situation And Prospect of Dam Deformation Measurement

1991, 0 (1): 15-24   

Observation design

Stability Monitoring of Dam Abutment. Rock Mass of the Dongjiang Hydropower Station

1991, 0 (1): 25-38   

Some Problems on Observation Design of Vertical Displacement at the Gezhouba Large Dam

1991, 0 (1): 39-46   

Data analysis

Some Improvements on Data, Analysis Method for Concrete Dam Displacement Observation

1991, 0 (1): 47-55   

Monitoring instruments

Application of the Multiple Contact Deformeter for Measuring Abutment Rock Bed Deformation at the Jinshuitan Arch Dam

1991, 0 (1): 63-75