Please wait a minute...

Current Issue

2002 Vol.0, No. 5   Published: 28 October 2002
           
Overview

Introduction on Surveying Department of ECIDI and its practice

2002, 0 (5): 5-6   

Development,research and application of Modern Engineering Geodesy

2002, 0 (5): 7-12   

Overview on measurement technique,analysis and prediction on dam safety monitoring

2002, 0 (5): 13-16   

Research on the especially high accuracy construction network of hydropower stations

2002, 0 (5): 17-20   

Pumped storage stations

On construction network design and survey of pumped storage stations

2002, 0 (5): 21-23   

Research on leveling vertical control network to pumped storage stations

2002, 0 (5): 24-26   

New equipment

Research on new digital telemetering plumb-line equipment and tension line equipment

2002, 0 (5): 27-29   

Information technology

Research on dam management information system construction

2002, 0 (5): 30-32   

Monitoring automation

Research on application in deformation monitoring with Georobot

2002, 0 (5): 33-35   

Case study

Dam deformation prediction and analysis based on BP-ANN

2002, 0 (5): 36-38   

Research on setting up the GPS plane construction network of Jinping Tunnel

2002, 0 (5): 39-42   

Research on the network simulation calculation and optimization of Shanxi Hydropower Station

2002, 0 (5): 43-46   

Designing and establishing the construction control network of Tai’an Pumped Storage Station

2002, 0 (5): 47-48   

On innovation of monitoring network of Huangtankou Hydropower Station and data analysis

2002, 0 (5): 49-51   

On external deformation monitoring and stability of control network of Hunan zhen Hydropower Station

2002, 0 (5): 52-53