Previous Articles Next Articles
CHENG Kai and ZHU Xiao-sheng
Online:
Published:
程凯,朱孝生
Abstract: It costs15months overall from initial dam filling to impounding in Yinzidu project, the most filling intensity every month is up to 403 thousand m 3. Under those restricted requirement of complicated construction condition, strict quality control and limiting con-struction time, the contractor have made an effort to create harmony of quality and progress.?
摘要: 引子渡水电站拦河坝,从开始填筑到下闸蓄水总历时15个月,最高月填筑强度达40.3万m3。在复杂的施工条件严格的质量控制和紧张的工期要求下,创造了质量与进度的双赢。
程凯,朱孝生. 引子渡水电站面板堆石坝填筑与质量控制[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2004/V0/I2/41