Abstract: Huanglongtan hydropower station locates upstream of Danjiang dam, spaced 153 km. The paper analyzed the adverse influence of backwater of Danjiang dam on Huanglongtan dam, seepage-prevention of structures and the drainage. Accordingly, some suggestions and countermeasures were advanced, for reference.
Key words: heightening of Danjiang dam, seepage-prevention of Huanglongtan dam, drainage, influence
摘要: 丹江大坝加高是南水北调中线控制性工程,黄龙滩电站位于丹江口水利枢纽上游,两者相距153 km。笔者将丹江回水可能对黄龙滩大坝、水工建筑物防渗及排水的不利影响进行分析,并提出了一些具体的建议与对策。
关键词: 丹江大坝加高, 黄龙滩防渗, 排水, 影响
LIANG Guo-qing and GU Shao-feng. Influence of higher-level storage of Danjiang dam on seepage-prevention and drainage of Huanglongtan dam[J]. dam, 2013, 0(3): 23-26.
梁国清,顾绍峰. 丹江大坝加高蓄水对黄龙滩大坝防渗和排水影响分析[J]. 大坝与安全, 2013, 0(3): 23-26.