• Data analysis • Previous Articles Next Articles
HE Xiao- jun
Online:
Published:
何小军
Abstract: This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai’an pumped storage power station, as well as treatments to construction defects. Further more, the seepage in the beginning impounding period was analysed.
摘要: 介绍了泰安抽水蓄能电站上水库库盆采用的土工膜水平防渗措施及其施工缺陷处理, 并对水库初期蓄水中的渗漏情况进行了简要的分析。
何小军. 泰安抽水蓄能电站上水库防渗方案及其效果分析[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2007/V0/I3/36