• Monitoring technology • Previous Articles     Next Articles

Recorded performance appraisal of Shanxi concrete face- slab rockfill dam

ZHU Jin- jie, CHEN Zhen- wen and DU Xue- zhen   

  • Online:2007-06-28 Published:2007-06-28

珊溪混凝土面板堆石坝运行五年来实测性态评价

朱锦杰,陈振文,杜雪珍   

  1. 国家电力监管委员会大坝安全监察中心, 浙江杭州 310014

Abstract: This paper introduced the monitoring at Shanxi concrete face- slab rockfill dam. By analysis of dam deformation, stress distribution on face- slab and seepage, combined with comparison to finite element analysis result, the operation performance of the damwas appraised.

摘要: 简单介绍了珊溪面板堆石坝监测概况, 通过详细分析坝体变形、面板应力分布特点和渗流状况, 比较有限元分析成果, 对大坝运行性态做出评价。