dam ›› 2013, Vol. 0 ›› Issue (2): 12-14.

Previous Articles     Next Articles

Analysis on the operation risk of water cushion at Xiluodu hydropower station

WANG You-wei   

  1. Xiluodu Hydropower Plant of China Yangtze Power Co., Ltd.
  • Received:2012-12-25 Online:2013-05-01 Published:2013-05-01

溪洛渡电站水垫塘运行风险浅析

王有伟   

  1. 中国长江电力股份有限公司溪洛渡水力发电厂,湖北 宜昌 443000
  • 作者简介:王有伟(1983- ),男,河南南阳人,工程师,从事水电工程建筑维护及安全监测工作。

Abstract: In this paper, risk factors of Xiluodu hydropower station during operation and maintenance were analyzed in detail. Accordingly, strategies were put forward, which provided a valuable reference for the operation of water cushion.

Key words: Xiluodu hydropower station, water-cushion, operation, maintenance, strategy

摘要: 对溪洛渡电站运行和检修工况下面临的安全风险因素进行了详细的分析,并提出了具体的应对策略,为水垫塘投入运行提供了具有价值的参考资料。

关键词: 溪洛渡水电站, 水垫塘, 运行, 检修, 策略