Abstract: The design task of pumped storage project is heavy, the time is limited, and there are many disciplines involved. Therefore, traditional design methods are unable to satisfy the current situation and requirements. Using BIM technology, through meticulous application planning, the collaborative design is carried out, covering surveying, civil engineering, mechanical and electrical engineering, and other re - lated disciplines. It can significantly improve the rationality of design schemes, enhance the accuracy and quality of design results, increase the diversity of results, liberate the productivity of designers, and provide a solid foundation for the application of digital twin pumped storage power stations. This study briefly describes the way to choose a suitable 3D digital collaborative design solution for pumped storage power stations and carry out 3D digital design, as well as the value and advantages of 3D digital technol- ogy in the design stage of pumped storage power stations.
Key words: pumped storage power station, 3D, digitization, collaborative design, BIM
摘要: 抽水蓄能项目设计任务重、周期短、专业多,传统方式难以满足目前的生产形势和要求。采用BIM 技术进行三维数字化协同设计,通过精细的应用策划,开展涵盖勘测、土建、机电等专业的协同设计应用,能大幅提升设计方案合理性,提高设计成果精准度及质量,增加成果多样性,解放设计人员生产力,并为数字孪生抽水蓄能电站应用提供坚实的基础底座。笔者简述了如何选择合适的抽水蓄能电站三维数字化协同设计解决方案,如何开展三维数字化设计,以及三维数字化技术在抽水蓄能电站设计阶段的价值优势。
关键词: 抽水蓄能电站, 三维, 数字化, 协同设计, BIM
CLC Number:
TV734
LIU Lixiang, CAO Kejie and ZHAO Hanqiao. The 3D collaborative design for pumped storage power stations with BIM[J]. Dam & Safety, 2025, 0(4): 29-33.
柳丽香, 曹可杰, 赵汉桥. BIM 赋能抽水蓄能电站三维协同设计[J]. 大坝与安全, 2025, 0(4): 29-33.