Dam & Safety ›› 2023, Vol. 0 ›› Issue (5): 1-3,14.

    Next Articles

Pressure hydraulic jump in the culvert pipe under the dam with gate at water inlet and its hydraulic calculation

CAI Yongfeng, CAI Yongping and CAI Xiaohong   

  1. Jiangxi Water and Hydropower Construction Group Co., Ltd.
  • Received:2022-10-12 Revised:2023-03-22 Online:2023-10-20 Published:2023-10-20

进水口设闸门控流坝下涵管有压水跃及其水力计算

蔡勇峰1,蔡勇平2,蔡晓鸿3   

  1. 1.江西省水利水电建设集团有限公司,江西 南昌,330209;2.吉安市水利水电规划设计院,江西 吉安,343000;3.吉安市水利局,江西 吉安,343000
  • 作者简介:蔡勇峰(1994—),男,江西莲花人,助理工程师,主要从事水利工程施工技术管理工作。

Abstract: The hydraulic conditions for pressure hydraulic jump in the circular culvert pipe under the dam with gate are explored. The calculation method for the position of pressure hydraulic jump in the culvert pipe is proposed, and the corresponding formula for calculating the outlet water depth of culvert pipe is derived, and the specific calculation steps are provided with an example.

Key words: culvert pipe under dam, flow control by gate, hydraulic calculation

摘要: 探明设闸门控流圆形坝下涵管发生有压水跃的水力学条件,并提出有压水跃在涵管内位置的计算方法,推导相应涵管出口水深计算公式,举例介绍了具体计算步骤。

关键词: 坝下涵管, 设闸门控流, 水力计算

CLC Number: