Dam & Safety ›› 2023, Vol. 0 ›› Issue (1): 33-36.
Previous Articles Next Articles
WANG Xiaoqiang, WU Lu and TANG Huanhuan
Received:
Revised:
Online:
Published:
王晓强,吴 露,唐欢欢
作者简介:
Abstract:
Key words: "> rock wall crane beam, anchor bolt, monitoring section, anchor stress meter, reinforcement meter, joint meter
摘要:
关键词: 岩壁吊车梁, 锚杆, 监测断面, 锚杆应力计, 钢筋计, 测缝计
CLC Number:
TV731
WANG Xiaoqiang, WU Lu and TANG Huanhuan.
王晓强, 吴 露, 唐欢欢. 施工期地下厂房岩壁吊车梁安全性态初步分析[J]. 大坝与安全, 2023, 0(1): 33-36.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2023/V0/I1/33
[1] 刘忠富,蔡洪亮,刘枫,等.蒲石河抽水蓄能电站地下厂房 岩锚梁施工期安全监测[C]. 抽水蓄能电站工程建设文 集,2008:210-215.
[2] 杨定华,王朝晴,欧阳涛.江垭地下主厂房岩锚梁安全性 态分析[J].人民长江,2000(4):11-12.