Dam & Safety ›› 2022, Vol. 0 ›› Issue (5): 37-40.

Previous Articles     Next Articles

Water filling and drainage test of water conveyance system No. 1 of Fujian Zhouning pumped storage power station

CAO Zhu, WU Meiqiang and ZHOU Zhanyong   

  1. PowerChina Huadong Engineering Co., Ltd.
  • Received:2021-12-30 Online:2022-10-08 Published:2023-01-12

福建周宁抽水蓄能电站1号输水系统充排水试验

曹 竹1 ,巫美强2 ,周站勇3   

  1. 1.中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122;2.中国华电集团有限公 司福建分公司,福建 福州,350013;3.华电福新周宁抽水蓄能有限公司,福建 宁德,352100
  • 作者简介:曹 竹(1981—),女,江苏扬州人,高级工程师,主要从事抽水蓄能电站设计工作。

Abstract: Combined with the water filling and drainage test of water conveyance system No. 1 of Fujian Zhouning pumped storage power station, the purpose, required engineering condition, method, procedure and process of the test are introduced, and the monitoring results are analyzed. The test results show that the design, construction and installation quality of water conveyance system No. 1 have passed the preliminary test.

Key words: Zhouning pumped storage power station, water conveyance system, water filling and drainage test

摘要: 结合福建周宁抽水蓄能电站1号输水系统充排水试验,介绍了充排水试验的目的、应具备的工程条件、试 验方式、程序和过程等,并对充排水试验的监测结果进行了重点分析。试验表明,1号输水系统的设计、施工及安 装质量通过了初步检验。

关键词: 周宁抽水蓄能电站, 输水系统, 充排水试验