Dam & Safety ›› 2022, Vol. 0 ›› Issue (5): 37-40.
Previous Articles Next Articles
CAO Zhu, WU Meiqiang and ZHOU Zhanyong
Received:
Online:
Published:
曹 竹1 ,巫美强2 ,周站勇3
作者简介:
Abstract: Combined with the water filling and drainage test of water conveyance system No. 1 of Fujian Zhouning pumped storage power station, the purpose, required engineering condition, method, procedure and process of the test are introduced, and the monitoring results are analyzed. The test results show that the design, construction and installation quality of water conveyance system No. 1 have passed the preliminary test.
Key words: Zhouning pumped storage power station, water conveyance system, water filling and drainage test
摘要: 结合福建周宁抽水蓄能电站1号输水系统充排水试验,介绍了充排水试验的目的、应具备的工程条件、试 验方式、程序和过程等,并对充排水试验的监测结果进行了重点分析。试验表明,1号输水系统的设计、施工及安 装质量通过了初步检验。
关键词: 周宁抽水蓄能电站, 输水系统, 充排水试验
CLC Number:
TV743
CAO Zhu, WU Meiqiang and ZHOU Zhanyong. Water filling and drainage test of water conveyance system No. 1 of Fujian Zhouning pumped storage power station[J]. Dam & Safety, 2022, 0(5): 37-40.
曹 竹, 巫美强, 周站勇. 福建周宁抽水蓄能电站1号输水系统充排水试验[J]. 大坝与安全, 2022, 0(5): 37-40.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2022/V0/I5/37
[1] DL/T 1770—2017,抽水蓄能电站输水系统充排水技术规 程[S].北京:中国标准出版社,2017.
[2] 张春生,姜忠见.抽水蓄能电站设计[M].北京:中国电力出 版社,2012.