Dam & Safety ›› 2021, Vol. 0 ›› Issue (3): 68-.

Previous Articles    

Analysis on cause of leaning and deformation of the left tailrace training wall of a hydropower station and its treatment#br#

XIE Jinji and GAN Jingguo   

  1. Centralized Control Center (Hongshui River) of Guangxi Branch of China Datang Co., Ltd.
  • Received:2020-06-13 Revised:2020-07-16 Online:2021-06-08 Published:2021-11-25

某水电站厂房尾水左导墙倾斜变位成因分析与处理

谢金记1,甘经国2   

  1. 1. 中国大唐集团有限公司广西分公司(红水河)集控中心,广西 南宁,530029;2. 广西桂冠开投电力有限责任公司,广西 南宁,530029
  • 作者简介:谢金记(1969— ),男,广西陆川人,高级工程师,主要从事水电站大坝运行安全技术管理工作。

Abstract: The cause reasons of leaning and deformation of the left tailrace training wall of a hydropower station as well as its failure mechanism are analyzed. Accordingly, the rehabilitation measures are advanced and studied, which is worthy reference.

Key words: tailrace training wall, leaning and deformation, cause analysis, rehabilitation

摘要: 对厂房左导墙倾斜变位成因和破坏机理进行分析,提出导墙补强加固措施方案并进行研究论证,为类似工程补强加固处理提供借鉴。

关键词: 尾水导墙, 倾斜变位, 原因分析, 补强加固

CLC Number: