Analysis on observation results of Huaguangtan Ⅱ hydropower dam during reservoir emptying

ZHANG Hongyan   

  1. Zhejiang Zheneng Huaguangtan Hydropower Co., Ltd.
  • Received:2020-05-09 Revised:2020-05-15 Online:2021-06-08 Published:2021-11-25

华光潭二级水电站水库放空期间大坝观测分析

张宏燕   

  1. 浙江浙能华光潭水力发电有限公司,浙江  杭州,311322
  • 作者简介:张宏燕(1984— ),女,浙江衢州人,工程师,研究方向为水工观测。

Abstract: Huaguangtan Ⅱ hydropower dam is a concrete gravity dam. Through analyzing the monitoring data of dam operation during reservoir emptying and impounding, the influence of load on the dam can be understood.


Key words: Huaguangtan Ⅱ hydropower station, reservoir emptying, analysis of observation results

摘要: 华光潭二级水电站拦河坝由混凝土重力坝组成,对水库放空及回蓄期大坝运行监测资料进行分析,以了解大坝受水荷载的影响程度。

关键词: 华光潭二级水电站, 水库放空, 观测分析