Abstract: Baihetan hydropower station has a huge installed capacity as well as large unit capacity, therefore, the transportation of major parts is one of the important tasks. Combined with the feasibility study of Baihetan hydropower station, the implementation of transportation of the major parts is introduced in this paper, for reference.
Key words: Baihetan hydropower station, 1 000 MW hydropower generator unit, transportation of major part
摘要: 白鹤滩水电站装机容量和单机容量巨大,重大件运输方案的研究是重要的工作内容。笔者结合可行性研究的成果,介绍了主要重大件运输实施的概况,供参考。
关键词: 白鹤滩水电站, 1 000 MW水轮发电机组, 重大件运输
CLC Number:
TH215
SONG Gangyun, CHEN Hao and DU Qingpin. Overview of transportation of major parts for Baihetan hydropower station[J]. Dam & Safety, 2021, 0(3): 26-.
宋刚云, 陈 浩, 杜清玭. 白鹤滩水电站重大件运输概况[J]. 大坝与安全, 2021, 0(3): 26-.