Dam & Safety ›› 2020, Vol. 0 ›› Issue (6): 59-62.

Previous Articles     Next Articles

Construction technique applied at Alagou asphalt concrete core dam under special weather conditions

FANG Chen   

  1. Water Management Bureau of Gaochang Area, Turpan City
  • Received:2020-04-08 Online:2020-12-08 Published:2020-12-08

新疆阿拉沟水库沥青心墙坝特殊气候施工技术

房  晨   

  1. 新疆吐鲁番市高昌区水管总站,新疆 吐鲁番,838099
  • 作者简介:房 晨(1977— ),男,河南南阳人,高级工程师,从事水利工程建设与管理工作。

Abstract: During the construction of Alagou asphalt concrete core dam, special weather conditions are encountered. Therefore, research are carried out, including (1) construction technique in low temperature; (2) protection scheme over winter; (3) construction technique in high temperature, for reference.

Key words: asphalt concrete core dam, construction technique in low temperature, protection scheme over winter, construction technique in high temperature

摘要: 针对阿拉沟水库沥青混凝土心墙坝的特殊气候条件,进行了以下研究:(1)低温条件下(-20℃),沥青混凝土心墙低温施工技术;(2)沥青混凝土越冬保护方案;(3)高温条件下,沥青混凝土心墙高温施工技术,以期为类似气候条件施工提供参考。

关键词: 沥青混凝土心墙坝, 低温施工技术, 越冬保护方案, 高温施工技术