• Operation management • Previous Articles Next Articles
WANG Xu-dong, WANG Li -bin and CHEN Yang
Online:
Published:
王旭东1,王立彬2,陈洋3
Abstract: Safety assessment of diseased reservoirs is the premise of rehabilitation. Integrative analysis should be carried out before rehabilitation in aspects such as project quality, flood prevention, dam safety, anti-seismic safety, structural safety, metal structural safety, safety monitoring and et al. This would present reliable data for further design.
摘要: 病险水库的安全评价是除险加固的前提。从工程总体情况、防洪安全、坝体安全、抗震安全、结构安全、金属结构安全、安全监测等方面对大坝安全状况进行综合分析,为病险水库除险加固设计提供可靠的资料和依据。
王旭东,王立彬,陈洋. 某病险水库除险加固安全评价[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2009/V0/I2/19