Dam & Safety ›› 2019, Vol. 0 ›› Issue (4): 68-69.

Previous Articles     Next Articles

Upgrade and renovation of DC system of Qiafuqihai Hydropower Station

CHEN Fu-jian   

  1. Xinjiang Yili River Basin Development and Construction Authority
  • Received:2019-05-24 Online:2019-08-30 Published:2019-08-30

恰甫其海水电站直流系统升级改造

陈福建   

  1. 新疆伊犁河流域开发建设管理局,新疆 伊犁,835000
  • 作者简介:陈福建(1987-),男,工程师,主要从事水电厂设备升级改造、日常技术处理工作。

Abstract: The existing problems of DC system of Qiafuqihai Hydropower Station are analyzed in the paper. According to the current national standards and industry regulations, the upgrade scheme, construction process and post-upgrade situation of DC system are described.

Key words: Qiafuqihai hydropower station, DC system, equipment aging, upgrade

摘要: 主要对恰甫其海水电站直流系统存在问题进行分析,根据现行相关国家标准、行业规程制定升级改造方案,并介绍施工过程及升级改造后的情况。

关键词: 恰甫其海水电站, 直流系统, 设备老化, 升级改造