Dam & Safety ›› 2019, Vol. 0 ›› Issue (4): 68-69.
Previous Articles Next Articles
CHEN Fu-jian
Received:
Online:
Published:
陈福建
作者简介:
Abstract: The existing problems of DC system of Qiafuqihai Hydropower Station are analyzed in the paper. According to the current national standards and industry regulations, the upgrade scheme, construction process and post-upgrade situation of DC system are described.
Key words: Qiafuqihai hydropower station, DC system, equipment aging, upgrade
摘要: 主要对恰甫其海水电站直流系统存在问题进行分析,根据现行相关国家标准、行业规程制定升级改造方案,并介绍施工过程及升级改造后的情况。
关键词: 恰甫其海水电站, 直流系统, 设备老化, 升级改造
CHEN Fu-jian. Upgrade and renovation of DC system of Qiafuqihai Hydropower Station[J]. Dam & Safety, 2019, 0(4): 68-69.
陈福建. 恰甫其海水电站直流系统升级改造[J]. 大坝与安全, 2019, 0(4): 68-69.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2019/V0/I4/68