Dam & Safety ›› 2019, Vol. 0 ›› Issue (1): 63-.

Previous Articles     Next Articles

Quality control of the construction of Guanyinyan core wall rockfill dam

ZHANG Bing-chu   

  1. Zhejiang Huadong Engineering Construction and Management Co., Ltd.
  • Received:2018-09-03 Revised:2018-09-07 Online:2019-02-08 Published:2019-02-08

观音岩水电站心墙堆石坝施工质量控制办法

张炳初   

  1. 浙江华东工程建设管理有限公司,浙江 杭州,311122
  • 作者简介:张炳初(1974- ),男,陕西山阳人,工程师,主要从事项目管理和施工技术工作。

Abstract: The maximum height of Guanyinyan clay core wall rockfill dam is 75 m. The requirements on filling quality are high and the procedures are complicated, especially for the core clay material which is naturally mined, with low water content, more super-diameter stone and long storage time. During construction, quality control measures were taken, from source selection to on-site construction and filling, which ensured the construction quality of the core rockfill dam.

Key words: core wall rockfill dam, construction quality, control method

摘要: 观音岩水电站粘土心墙堆石坝最大坝高75 m,施工中填筑质量要求高,工序复杂,尤其自然开采心墙粘土料,含水率低、超径石偏多、堆存时间长。施工中,从料源选择到现场施工填筑各个环节都采取了严密的质量控制措施,保证了心墙堆石坝的施工质量。

关键词: 心墙堆石坝, 施工质量, 控制办法