Dam & Safety ›› 2018, Vol. 0 ›› Issue (4): 22-24.

Previous Articles     Next Articles

Calculation and analysis on construction ventilation cost of underground caverns in Baihetan hydropower station

ZHANG Guang- fei and SHI Wei- da   

  1. China Three Gorges Projects Development Co., Ltd.
  • Received:2018-01-15 Online:2018-08-08 Published:2018-08-08

白鹤滩水电站地下洞室群施工通风费用计算分析

张光飞1,史伟达2   

  1. 1. 中国三峡建设管理有限公司,四川 成都,610000;2. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122
  • 作者简介:张光飞(1985- ),男,山东日照人,工程师,主要从事工程造价管理工作。

Abstract: According to Regulation of Budget Estimation for Hydropower Projects (2013 Edition), the construction ventilation cost for underground projects is estimated as a part of total construction cost, and included in other temporary construction cost. However, for large underground caverns with high ventilation cost, it should be estimated separately based on the actual situation. Taking underground water diversion and power generation system of Baihetan hydropower station as an example, this paper makes a preliminary analysis and calculation for construction ventilation cost of large underground caverns.

Key words: underground caverns, construction ventilation cost, Baihetan hydropower station

摘要: 目前执行的《水电工程设计概算编制规定(2013年版)》中将地下工程施工通风费用包含在其他施工辅助工程投资中,而对于大型地下洞室群通风费用高的项目,应根据实际情况单独列项计算更合理。以白鹤滩水电站地下引水发电系统为例,对大型地下洞室群施工通风费用进行初步分析和计算。

关键词: 地下洞室群, 通风费用, 白鹤滩水电站