Dam & Safety ›› 2018, Vol. 0 ›› Issue (4): 18-21.

Previous Articles     Next Articles

Analysis of temperature control cost for arch dam of Baihetan hydropower station under construction

ZHU Liang, SU Jin-peng and XU Xu-min   

  1. PowerChina Huadong Engineering Corporation Limited
  • Received:2018-01-15 Revised:2018-02-08 Online:2018-08-08 Published:2018-08-08

白鹤滩水电站拱坝施工期混凝土温控费用分析

朱 亮1,苏锦鹏2,徐旭敏1   

  1. 1. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122;2. 中国三峡建设管理有限公司白鹤滩工程建设部,云南 昭通,654602
  • 作者简介:朱 亮(1990- ),男,河南信阳人,工程师,研究方向为工程造价。

Abstract: Baihetan hydropower dam is a concrete double-curvature arch dam. During the dam construction, some temperature control measures are needed all the year round, and the cost of temperature control measures is high. For reflecting the inner constitution of the temperature control cost, this paper first analyzed the process of temperature control construction and broke down the temperature control cost. Then, based on the staffing at the construction site, the material  onsumption and the equipment layout, the unit-price of the concrete pre-cooling and water cooling were calculated by the material measuring method.

Key words: Baihetan hydropower station, double-curvature arch dam, temperature control cost, unitprice of the concrete pre-cooling and water cooling, material measuring method

摘要: 白鹤滩水电站拦河坝为混凝土双曲拱坝,大坝全年温控施工,温控费用高。通过对施工期温控过程进行分析,分解温控费用,并根据施工现场人员配置、材料消耗、设备布置,采用实物量法对关键性的混凝土预冷和通水冷却单价进行分析计算。

关键词: 白鹤滩水电站, 双曲拱坝, 温控费用, 混凝土预冷和通水冷却单价, 实物量法