Abstract: The AHP and fuzzy comprehensive evaluation method is used for tunnel construction risk management. Research results show that the risk evaluation index and main risk source can be given, which provides a reliable reference for the construction risk management and risk reduction.
Key words: risk management, AHP, fuzzy comprehensive evaluation method, tunnel, construction management
摘要: 采用层次分析法(AHP)和模糊综合评价方法对隧道施工风险管理进行研究,研究结果表明,该方法能够给出定性风险评语的量化指标,并能识别项目的主要风险源,为项目施工的风险管理提供可靠的参考依据,从而通过项目管理手段降低工程项目施工风险。
关键词: 风险管理, 层次分析法, 模糊综合评价, 隧道, 施工管理
WANG Zheng-fen. Application of AHP and fuzzy comprehensive evaluation in tunnel construction risk management[J]. dam, 2016, 0(6): 10-.