In this paper, a brief introduction to the reconstruction project of Fengman dam was carried out, and the operation state of the original dam during reconstruction was analyzed, for reference.
Key words: reconstruction of Fengman dam, construction period, original dam, operation state analysis
摘要: 对丰满大坝重建工程进行了简介,并对丰满大坝重建施工期老坝运行性态进行了分析,供参考。
关键词: 丰满大坝重建, 施工期, 老坝, 运行性态分析
LI Zuo-guang. Analysis on operation state of the original dam during reconstruction of Fengman dam[J]. dam, 2016, 0(5): 41-.