dam ›› 2016, Vol. 0 ›› Issue (5): 41-.

Previous Articles     Next Articles

Analysis on operation state of the original dam during reconstruction of Fengman dam

LI Zuo-guang   

  1. Fengman Hydropower Plant
  • Received:2016-02-29 Revised:2016-03-17 Online:2016-10-08 Published:2016-10-08

丰满大坝重建施工期老坝运行性态分析

李作光   

  1. 丰满发电厂,吉林 吉林,132108
  • 作者简介:李作光(1966- ),男,吉林桦甸人,硕士,高级工程师,主要研究方向为大坝安全监测。

Abstract:

In this paper, a brief introduction to the reconstruction project of Fengman dam was carried out, and the operation state of the original dam during reconstruction was analyzed, for reference.

Key words: reconstruction of Fengman dam, construction period, original dam, operation state analysis

摘要: 对丰满大坝重建工程进行了简介,并对丰满大坝重建施工期老坝运行性态进行了分析,供参考。

关键词: 丰满大坝重建, 施工期, 老坝, 运行性态分析