CLC Number:
HAN Rong-rong and ZHENG Xiao-hong. Safety monitoring design and results analysis on impoundment period of the rock-fill dam of Xianju pumped storage power station's upper reservoir[J]. dam, 2016, 0(4): 30-.
韩荣荣,郑晓红. 仙居抽蓄电站上水库面板堆石坝安全监测设计及蓄水期成果分析[J]. 大坝与安全, 2016, 0(4): 30-.