Safety monitoring design and results analysis on impoundment period of the rock-fill dam of Xianju pumped storage power station's upper reservoir

HAN Rong-rong and ZHENG Xiao-hong   

  1. PowerChina Huadong Engineering Corporation Limited
  • Received:2016-07-06 Online:2016-08-08 Published:2016-08-08

仙居抽蓄电站上水库面板堆石坝安全监测设计及蓄水期成果分析

韩荣荣,郑晓红   

  1. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122
  • 作者简介:韩荣荣(1984- ),女,陕西宝鸡人,硕士,工程师,主要从事大坝安全管理和工程监测技术研究。

Abstract: The main dam of Xianju pumped storage power station's upper reservoir is a rock-fill dam with the maximum height of 88.2 m and its crest length is 263.66 m. The reservoir began to store water in June 2015 and the normal water level is reached in May 2016. The paper introduces the monitoring design for the rock-fill dam and a preliminary analysis on the main monitoring results is carried out, which shows that the results are in a reasonable range and the dam runs well.

null

Key words: Xianju pumped storage power station, rock-fill dam, monitoring, design, analysis

摘要: 仙居抽水蓄能电站上水库主坝为面板堆石坝,最大坝高88.2 m,坝顶长度263.66 m,2015年6月蓄水并于2016年5月底达到正常蓄水位。对面板堆石坝的监测设计方案进行了系统介绍,对蓄水期的主要监测成果进行了初步分析,表明大坝变形、渗流、面板应变基本处于合理范围,大坝运行正常。

关键词: 仙居抽水蓄能电站, 面板堆石坝, 监测, 设计, 分析