• Overview •     Next Articles

Present situation and prospect of hydropower development of Northeast Grid Co.

LIU Feng-xue and FANG Guozhong   

  • Online:2009-08-28 Published:2009-08-28

东北电网公司水电现状及展望

刘凤学,房国忠   

  1. 东北电网有限公司,辽宁沈阳 110181

Abstract: Hydropower is the ideal standby power supply for peak regulation and frequency modulation, but its proportion in Northeast Grid is small. As the development of grid and increase of peak-valley difference, to satisfy the need of grid, construction of hydropower plants and pumped storage power stations should speed up.

摘要: 水电是电力系统理想的调峰、调频和事故备用电源,但水电在东北电网中所占比重较小。由于电网的发展和峰谷差的加大,今后在加快风电、核电、火电等电站建设的同时,应加快常规水电和抽水蓄能电站的建设,以满足电网的需要。