Abstract: To ensure the safety of its 450 hydroelectric projects, Electricite de France has used risk analysis to prioritize required maintenance. Work now underway will cost 500 million Euros (US$716 million) and help ensure the continued reliable operation of these important hydraulic structures.
摘要: 为了确保所属450 座水电站的安全,法国电力公司已经运用风险分析对维修工作排序。此项目前正在开展的、耗资达5 亿欧元(7.16 亿美元)的工作将有助于保障这些重要的水工结构的持续可靠运行。
杜德进. 法国电力公司水电站水工建筑物安全管理最新进展[J]. .