• Data analysis • Previous Articles Next Articles
HU Zi - jun
Online:
Published:
胡子俊
Abstract: Because of lowflood prevention ability, higher damfoundation uplift pressure than standard and the uncertainty of the fault F2 , damsafety and stability was effected. As a result, Xianghongdian reservoir damwas classified as Grade 3. This paper introduced the investigation test of damfoundation uplift pressure, analysed the cause reason and advanced the treatment advice.
摘要: 响洪甸水库大坝被评定为三类坝, 其最主要原因是该库的防洪能力不足、大坝坝基扬压力过高和F2 断层难以确定, 严重影响大坝的安全稳定。本文主要对坝基扬压力过高的探查试验情况进行介绍, 对产生的原因进行分析, 并提出了处理方案的设想。
胡子俊. 响洪甸水库坝基扬压力异常原因及处理方法的探讨[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2007/V0/I4/39