Analysis on safety monitoring data of Bikou dam

CHEN Rong and LIU Lin   

  • Online:2011-06-28 Published:2011-06-28

震后碧口大坝安全监测资料分析

陈容,刘林   

  1. 甘肃大唐碧口水力发电厂,甘肃碧口 746412

Abstract: 5·12 earthquake exerted some influence on Bikou dam. After that, two-year dam monitoring and data analysis showed that dam deformation was well-distributed and convergent, the saturation line was lower than designed elevation and the dam has been in normal operation state.

摘要: “5·12”汶川特大地震后,碧口大坝运行正常。通过震后两年半的大坝监测数据采集、整理及分析,碧口大坝变形均匀且趋于收敛状态,大坝浸润线测值均低于设计值,无异常变化,大坝处于正常运行状态。