• Monitoring technology • Previous Articles     Next Articles

Renovation of automatic plumb line system of Lijiaxia hydropower station

ZHANG Jing-li   

  • Online:2012-10-28 Published:2012-10-28

李家峡水电站垂线自动化系统改造

张京利   

  1. 青海黄河水电公司大坝管理中心,青海西宁 810008

Abstract: By comparison, this paper introduced the automatic monitoring system before and after the renovation of plumb line system. Further, the installation and test of the system as well as the data linkage were presented, for reference.

摘要: 结合李家峡水电站大坝监测系统现状,详细叙述了李家峡水电站垂线监测系统自动化改造前、后的自动化系统现状,系统安装调试及数据衔接等,供参考。