• Operation management • Previous Articles Next Articles
An Xiao-min
Published:
安小敏
Abstract: In this paper, the scheme altering the model of reservoir operation,operating at low level in flood-peroid and desilting by density flow have been put forword on the basis of cross-section measurement result of sedimentation at reservoir area in Kezhi’er Reservoir?
摘要: 本文根据克孜尔水库库区断面泥沙淤积测量成果%并结合水库运行方式,提出改变水库运行方式、汛期水库低水位运行并利用异重流排沙的方案。
安小敏. 克孜尔水库库区泥沙淤积现状及排沙方案[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2002/V0/I4/10