• Rehabilitation • Previous Articles     Next Articles

Leakage treatment for structure cracks in 3rd grade lock of Wuqiangxi Powerplant

Deng Wen-bing   

  • Published:2003-02-28

五强溪水电厂三级船闸结构缝漏水处理

邓文兵   

  1. 五强溪水电厂,湖南沅陵 419642

Abstract: Leakage through the structure cracks in the third grade lock and treatment for it are introduced in this paper. The sealing material and its construction technique are presented as well.

摘要: 介绍了五强溪水电厂三级船闸结构缝漏水情况及止漏处理过程,并对止水材料和防水止水施工工艺进行了介绍。