Dam & Safety ›› 2026, Vol. 0 ›› Issue (2): 68-.
Previous Articles Next Articles
WANG Bin, ZANG Peng, LI Qiaobin, ZHONG Jiuan, FENG Yangwen and CHEN Yi
Online:
Published:
王 斌,臧 鹏,李乔斌,钟久安,冯杨文,陈 益
作者简介:
Abstract: In order to recheck the impermeability of abutments and dam foundation of Donuo hydropow_ er station after the earthquake, it is necessary to check the quality of dam grouting curtain under the re_ servior impoundment condition. The drilling depth of the underwater inspection hole is 40~69 m, and the drilling is difficult. By comprehensively using the floating boat platform, diving technology, underwa_ ter positioning and drilling technology, the quality inspection of dam curtain under the condition of reser_ vior impoundment has been successfully completed, which offers important reference for similar projects.
Key words: grouting curtain, quality inspection, reservior impoundment condition, underwater drilling
摘要: 为复查多诺水电站震后大坝坝肩及坝基的防渗性,需在蓄水条件下进行大坝灌浆帷幕质量检查。水下检查孔施工水深达40~69 m,钻孔难度大,综合采用水上浮船平台、潜水技术、水下定位与钻探技术,成功完成了蓄水条件下大坝帷幕质量检查,对类似工程具有重要的借鉴意义。
关键词: 灌浆帷幕, 质量检查, 蓄水条件, 水下钻孔
CLC Number:
TV697
WANG Bin, ZANG Peng, LI Qiaobin, ZHONG Jiuan, FENG Yangwen and CHEN Yi. Research and application of the construction technology of underwater inspection hole for dam curtain grouting[J]. Dam & Safety, 2026, 0(2): 68-.
王 斌, 臧 鹏, 李乔斌, 钟久安, 冯杨文, 陈 益. 水下大坝帷幕灌浆检查孔施工技术研究与应用[J]. 大坝与安全, 2026, 0(2): 68-.