|
[1] NB/T 35079—2016,地下厂房岩壁吊车梁设计规范[S].
[2] 赵震英,曾亚武.岩锚吊车梁承载机理模型试验研究[J].岩土工程学报,2002(2):150-153.
[3] 刘文.彭水水电站地下厂房岩壁吊车梁高强预应力锚杆二次张拉施工技术[J].水利水电技术,2010,41(7):57-59,82.
[4] 周述达,易路,陈锐.水布垭水电站地下厂房吊车梁设计[J].人民长江,2007(7):42-43.
[5] Bowcock J B,Boyd J M,Hoek E,et al.Drakensberg Pumped Storage Scheme: Rock Engineering Aspects[C].Proceedings of the Symposium on Exploration for Rock Engineering,1976,2:121-139.
[6] 姚德生,周宏民,张忠辉.地下厂房岩壁吊车梁设计[J].水利水电工程设计,2022,41(2):26-28,56.
[7] Anastassopoulos K,Hoek E,Milligan V,et al.Thissavros Hydropower Plant Managing Geotechnical Problems in the Construction[C].Fifth International Conference on Case Histories in Geotechnical Engineering,2004.
[8] GB 50086—2015,岩土锚杆与喷射混凝土支护工程技术规范[S].
[9] BS 8081:2015,Code of practice for grouted anchors[S].
[10] Wu J Y,Damjanac B,Liu J J,et al.Study on Unloading of Overloaded Prestressed Anchors in an Underground Cavern Complex[C].ISRM Regional Symposium- 11th Asian Rock Mechanics Symposium,2021.
|