Dam & Safety ›› 2023, Vol. 0 ›› Issue (1): 50-55.
Previous Articles Next Articles
WANG Linlin
Received:
Revised:
Online:
Published:
王林林
作者简介:
Abstract:
Key words: dam leakage, reinforcement grouting, plugging, surface watertight seal, crack treatment
摘要:
关键词: 大坝渗漏, 补强灌浆, 封堵, 表层止水, 裂缝处理
CLC Number:
TV641.4
WANG Linlin. Treatment measures of dam leakage at Baishahe hydropower station[J]. Dam & Safety, 2023, 0(1): 50-55.
王林林. 白沙河水电站大坝渗漏治理技术[J]. 大坝与安全, 2023, 0(1): 50-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2023/V0/I1/50