Research and application of operation safety risk control technology for Jinping I hydropower dam on Yalong river

LI Xiaoxiao and FENG Yongxiang   

  1. Yalong River Hydropower Development Co., Ltd.
  • Received:2021-08-24 Online:2022-06-10 Published:2022-09-02

雅砻江锦屏一级大坝运行安全风险管控技术研究与应用

李啸啸,冯永祥   

  1. 雅砻江流域水电开发有限公司,四川 成都,610056
  • 作者简介:李啸啸(1986—),男,河南南阳人,硕士,高级工程 师,主要从事水电站大坝安全监测、大坝运行安全管理工作。

Abstract: As the highest dam in the world, the design parameters and project scale of Jinping I hydropower dam are far beyond existing standards. Under complex environmental conditions, the dam operation safety risk is high and the management is difficult. By identification and analysis of the operation safety risk of Jinping I hydropower dam, Yalong River Company organized and carried out the research on key technologies of risk control, established the dam operation safety risk management system, and effectively realized the control of dam operation safety risk.

Key words: risk identification, information perception, hierarchical warning, online monitoring, emergency management

摘要: 锦屏一级大坝作为世界第一高坝,设计指标和工程规模均远超现行标准,在复杂环境条件下,运行安全风险高、管理难度大。雅砻江公司通过识别分析锦屏一级大坝运行安全风险,组织开展风险管控关键技术研究,建立大坝运行安全风险管理体系,有效实现了大坝运行安全风险管控。

关键词: 风险识别, 信息感知, 分级预警, 在线监控, 应急管理