Discussion on the impermeability design of the dam site of upper reservoir of Zhouning pumped storage hydropower station#br#

ZHANG Jian, CHEN Dongdong and GAN Haohua   

  1. Huadian Fuxin Zhouning Pumped Storage Co., Ltd.
  • Received:2019-08-07 Revised:2019-09-19 Online:2021-04-08 Published:2021-11-24

浅谈周宁抽水蓄能电站上水库副坝坝址区防渗设计

张  健1,陈冬冬2,淦浩华2   

  1. 1. 华电福新周宁抽水蓄能有限公司,福建宁德,352000;2. 华东勘测设计院(福建)有限公司,福建福州,350003
  • 作者简介:张 健(1987— ),男,福建莆田人,工程师,主要从事清洁能源基建项目管理工作。

Abstract: This paper, taking Zhouning pumped storage hydropower station as an example, analyzes the reasons for leakage in dam site area, and the impermeability design is carried out accordingly, to explore the application and practice of design principles which are worth reference.

Key words: dam site leakage, impermeability design, leakage analysis

摘要: 以周宁抽水蓄能电站上水库副坝为例,分析坝址区渗漏原因,并进行相应的防渗设计,研究防渗设计原则的应用与实践,供参考。

关键词: 坝址渗漏, 防渗设计, 渗漏分析