Dam & Safety ›› 2021, Vol. 0 ›› Issue (1): 41-45,49.

Previous Articles     Next Articles

Analysis on uplift trend of Jiangya dam during operation period

YANG Kaihua, LIU Yaxin, LIU Chang and QIN Peng   

  1. Hunan Lishui Hydro & Power Co., Ltd.
  • Received:2020-10-22 Revised:2020-11-26 Online:2021-02-10 Published:2021-11-25

江垭大坝运行期抬升变化趋势分析

杨开华1,柳亚新1,刘 常1,秦 朋2   

  1. 1.湖南澧水流域水利水电开发有限责任公司,湖南 长沙,410000;2.长江水利委员会长江科学院工程安全与灾害防治研究所,湖北 武汉,430010
  • 作者简介:杨开华(1970—),男,湖南汉寿人,工程师,主要从事水利工程建设与运行管理。

Abstract: After impoundment of Jiangya dam, the continuous uplift of dam and its surrounding mountain is discovered by measuring points for vertical deformation. Research identifies that the primary mechanism of continuous uplift is the head increase in confined hot water aquifer under dam foundation, which leads to the decrease of effective stress and the rebound deformation of rock mass. By the factor analysis based on dam safety monitoring data from 1998 to 2019, the effectiveness of applying rebound deformation mechanism to explain the dam uplift is verified, and the conclusion that the dam uplift is getting stable is obtained.

Key words: Jiangya water conservancy project, dam uplift, safety monitoring, factor analysis

摘要: 江垭大坝蓄水后,通过坝体垂直变形测点发现大坝及近坝山体产生了持续抬升的现象。经研究论证,认定抬升的主要机制是坝基下分布的承压热水含水层D2y水头增大,引起岩体有效应力降低,导致岩体发生回弹扩容。在过往研究的基础上,结合1998~2019年与抬升相关的大坝安全监测资料,通过因子分析等方法论证回弹扩容机制解释大坝抬升现状的有效性,并得出大坝抬升趋于稳定的结论。

关键词: 江垭水利枢纽, 大坝抬升, 安全监测, 因子分析

CLC Number: