Dam & Safety ›› 2020, Vol. 0 ›› Issue (4): 1-.

    Next Articles

Safety management of Yangfanggou hydropower project and its innovation

WANG Dengyin, HOU Jing, XIANG Haijun,LIU Jiayan and ZHANG Yong     

  1. PowerChina Huadong Engineering Corporation Limited
  • Received:2020-03-10 Revised:2020-03-30 Online:2020-08-08 Published:2020-08-08

杨房沟水电工程安全管理与创新

王登银1,侯 靖1,向海军2,刘家艳3,张 勇4   

  1. 1. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州,311122;2. 中国水利水电第七工程局有限公司,四川 成都,610213;3. 雅砻江流域水电开发有限公司,四川 成都,610051;4. 长江委工程监理中心杨房沟水电站总承包监理部,湖北 武汉,430015
  • 作者简介:王登银(1982— ),男,湖北随州人,高级工程师,主要从事水工建筑物设计、施工及安全管理研究。

Abstract: Yangfanggou hydropower station on Yalong river is the first million-kilowatt hydropower project under the engineering procurement construction mode in China. Through several years of exploration and practice, the main line of "one manual, two plans and seven standing books" of safety management has been summarized, and the regulations of safety standardization management for the projects with a high degree of danger and the general and special equipments have been formulated safety and implemented strictly. The level of safety management is improved through the innovation in safety management such as safety self-discipline management, safety technology application, etc. Standardization of safety production is implemented by the general constractor which passes the evaluation by third-party agencies every year. And the standardization of safety production has reached the Grade A which has effectively enhanced the standardization of safety production and construction.

Key words: Yangfanggou hydropower station, EPC, safety management, innovation management

摘要: 雅砻江杨房沟水电站是我国首个采用 EPC模式建设的百万千瓦级大型水电工程。通过几年的探索与实践,总结了安全管理“一个手册、两个规划、七个台帐”的主线,制定并严格落实危险性较大的分部分项工程作业安全标准化管理、通用及特种设备安全标准化管理等规定,并通过安全自律管理、安全科技应用等创新管理,提升安全管理水平。总承包部全面展开安全生产标准化建设工作,自开工以来,每年均通过第三方机构的安全生产标准化考评,达到电力安全生产标准化一级水平,有效提升了作业安全标准化和现场文明施工标准化水平。

关键词: 杨房沟水电站, EPC, 安全管理, 创新管理