Dam & Safety ›› 2019, Vol. 0 ›› Issue (6): 4-.

Previous Articles     Next Articles

Measures of seepage control in RCC dams

SHI Guihe   

  1. SINOHYDRO Bureau 7 Co., Ltd.
  • Received:2019-06-04 Revised:2019-07-09 Online:2019-12-20 Published:2019-12-08

碾压混凝土大坝渗水控制措施探讨

史桂合   

  1. 中国水利水电第七工程局有限公司,四川  成都,610213
  • 作者简介:史桂合(1979— ),男,河南舞阳人,高级工程师,研究方向为水利水电施工技术和国际工程项目管理。

Abstract: The construction characteristics of RCC and the necessity of taking measures to control seepage are stated firstly. Then the measures of seepage control regarding RCC dam body, connection between layers and impervious structures on upstream dam surface are presented successively with the example of Pakistan Gomal Zam dam project. At last, the conclusion is drawn that the applied measures for seepage control are effective, by analysis of the operation status since impounding of Gomal Zam dam.

Key words: RCC(Roller Compacted Concrete), dam, seepage control, measure

摘要: 笔者首先阐述了碾压混凝土的施工特点以及采取措施进行渗水控制的必要性,然后以巴基斯坦高摩赞碾压混凝土大坝工程为例,对工程所采取的碾压混凝土坝体、层间结合和坝前防渗结构等渗水控制措施进行探讨,最后根据大坝蓄水运行后的渗水控制效果,得出所采取的渗水控制措施行之有效的结论。

关键词: 碾压混凝土, 大坝, 渗水控制, 措施