Analysis on seepage monitoring data of Xiluodu hydropower dam during initial impoundment and operation

HU Lei, LI Bo and TIAN Ya-ling   

  1. Changjiang River Scientific Research Institute
  • Received:2017-05-17 Online:2017-08-08 Published:2017-08-08

溪洛渡水电站初蓄-运行期大坝渗流监测成果分析

胡 蕾1,2,3,李 波1,2,田亚岭1,2   

  1. 1.长江科学院,湖北 武汉,430010;2.水利部水工程安全与病害防治工程技术研究中心,湖北 武汉,430010;3.武汉大学水资源与水电工程科学国家重点实验室,湖北 武汉,430072
  • 作者简介:胡 蕾(1989- ),女,山东菏泽人,博士,主要从事水工结构实验、观测与分析工作。
  • 基金资助:
    国家重点研发计划资助项目(2016YFC0401602);国家自然科学基金项目(51609020,51409018);中央级公益性科研院所基本科研业务费(长江科学院CKSF2017067/GC)

Abstract: The maximum height of Xiluodu arch dam is 285.5 m. Seepage water is found in dam body and foundation after impoundment, which is a potential threat to dam safety. To get seepage behavior, seepage monitoring data is used to analyze variation and distribution rules of seepage. The results show that, anti-seepage curtain and drainage holes of Xiluodu dam have played their own role well; monitoring values of osmotic pressure are within allowable design range; the status of seepage around Xiluodu dam is reasonable and seepage flow tends to be stable.

Key words: high arch dam, safety monitoring, reduction factor, seepage

摘要: 洛渡拱坝最大坝高285.5 m,蓄水之后,渗流广泛存在于坝体和坝基之中,可能会威胁大坝安全。为掌握大坝的渗流状态,根据溪洛渡水电站初蓄-运行期大坝渗流监测成果,分析和评价了渗流变化规律和分布特征,为评估大坝运行安全提供依据。结果表明:溪洛渡大坝防渗帷幕及排水幕效果良好,帷幕后及排水幕后渗压折减系数均在设计允许范围以内,绕坝渗流状态合理,渗流量趋于稳定,大坝在初蓄-运行期的渗流发展过程和分布特征符合一般的认识规律,状态正常。

关键词: 高拱坝, 安全监测, 折减系数, 渗流量